← All uploads
ready
2026 Delivery Schedule Template 2026-10-20.xlsx
Run 5 · uploaded Nov 02, 2026 09:03 AM by VIVA Procurement · sheet "Sheet1 (2)", 80 batches
5 rows hidden in Excel were skipped (TAKA hides shipped batches). Unhide them in the workbook and upload again to include them.
| Row | Schedule line | Mode | Wrike task | Need By | LA Need By | Prior ETA → New ETA | Risk | PM last notified | Decision |
|---|---|---|---|---|---|---|---|---|---|
| Batch 2 · SZXCHI63001Y · ETA to DALLAS | |||||||||
| 7 |
25-107 IP1
Commonwealth Charter Academy · Extrution Aluminum panel
PO 25-107-005
1 note
|
AIR |
25-107 - Commonwealth
fuzzy · 84% · task title has no pack code to confirm IP1
1 candidate
|
none → Mar 25, 2026
TAKA: 2026-03-25 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| 8 |
25-107 IP2
Commonwealth Charter Academy · Extrution Aluminum panel
PO 25-107-004
1 note
|
AIR |
25-107 - Commonwealth
fuzzy · 84% · task title has no pack code to confirm IP2
1 candidate
|
none → Mar 25, 2026
TAKA: 2026-03-25 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| Batch 3 · SZXCHI64001Y KE320/03APR · ETA to DALLAS | |||||||||
| 21 |
25-213 - - Mock Up
Waxahachie ISD Creek HS Frame & BCCB · MOCK UP
PO NA
1 note
|
AIR |
25-213 - Waxahachie ISD Creek HS - SAMP (EXPEDITED) - TAKA- PO APPROVAL
fuzzy · 75% · only TAKA task for job 25-213
1 candidate
|
none → Apr 05, 2026
TAKA: 2026-04-05 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| Batch 5 · SZXCHI64002Y · ETA to DALLAS | |||||||||
| 55 |
24-120 -1IP1 replacement (part of materials)
TAMIU - MS Scope & Bridge · 5mm Aluminum panel
PO NA
2 notes
|
AIR |
24-120-10 - TAMIU
fuzzy · 77% · task title has no pack code to confirm 1IP1
1 candidate
|
none → Apr 13, 2026
TAKA: 2026-04-13 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| Batch 6 · SZXCHI64004Y · ETA to DALLAS | |||||||||
| 59 |
24-120 -1IP1 replacement (Balance materials)
TAMIU - MS Scope & Bridge · 5mm Aluminum panel
PO NA
1 note
|
AIR |
24-120-10 - TAMIU
fuzzy · 77% · task title has no pack code to confirm 1IP1
1 candidate
|
none → Apr 17, 2026
TAKA: 2026-04-17 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| Batch 7 · SZXCHI64003Y · ETA to DALLAS | |||||||||
| 61 |
25-050 - -replacement Infill Pack 1 (except 2pcs )
Cheshire Elementary School
PO NA
1 note
|
AIR |
25-050 - Cheshire Elementary School - Infill Pack 1 - Remake panels
fuzzy · 90% · job 25-050 + pack IP1; close runner-up
3 candidates
|
Apr 28, 2026 → Apr 16, 2026
-12d
TAKA: 2026-04-16 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| Batch 9 · SZXLAX64166X · ETA to LA | |||||||||
| 100 |
25-142 -- MP1
QTS DFW2 DC3 · SS316 FITTINGS
PO NA
2 notes
|
OCEAN |
25-142 - QTS DFW2 DC3 - MP1 - TAKA
fuzzy · 100% · job 25-142 + pack MP1
1 candidate
|
Aug 12, 2026 |
Aug 21, 2026 → May 21, 2026
-92d
TAKA: 2026-05-07 to LA
|
On track | Never |
Needs review
|
|
| Batch 10 · SZXCHI64005Y · ETA to DALLAS | |||||||||
| 104 |
25-050 replacement Infill Pack 1 (Balance IP21 and IP51 )
Cheshire Elementary School · Aluminum panel
PO NA
2 notes
|
AIR |
25-050 - Cheshire Elementary School - Infill Pack 1 - Remake panels
container · 97% · job 25-050 + container SZXCHI64005Y
|
Apr 28, 2026 → Apr 21, 2026
-7d
TAKA: 2026-04-21 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| Batch 11 · SZXCHI64006Y · ETA to DALLAS | |||||||||
| 121 |
25-213 MOCK UP
Waxahachie ISD Creek HS Frame & BCCB- Mock Up · MOCKUP
PO NA
2 notes
|
AIR |
25-213 - Waxahachie ISD Creek HS - SAMP (EXPEDITED) - TAKA- PO APPROVAL
fuzzy · 75% · only TAKA task for job 25-213
1 candidate
|
none → Apr 29, 2026
TAKA: 2026-04-29 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| 125 |
25-057 MP1 Remakes
Montage at Midtown · ST01 & ST03 Aluminum frame
PO NA
2 notes
|
AIR |
25-057-10 - Montage at Midtown
fuzzy · 84% · task title has no pack code to confirm MP1
1 candidate
|
none → Apr 29, 2026
TAKA: 2026-04-29 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| 126 |
25-050 - - Infill Pack 1---IP31--1PC
Cheshire Elementary School · Aluminum panel
PO NA
2 notes
|
AIR |
25-050 - Cheshire Elementary School - Infill Pack 1 - Remake panels
fuzzy · 90% · job 25-050 + pack IP1; close runner-up
3 candidates
|
Apr 28, 2026 → Apr 29, 2026
+1d
TAKA: 2026-04-29 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| Batch 13 · SZXCHI65001Y · ETA to DALLAS | |||||||||
| 152 |
25-213 - Mock Up (Replaced Alu panel )
Waxahachie ISD Creek HS Frame & BCCB- · Mock Up
PO NA
3 notes
|
AIR |
25-213 - Waxahachie ISD Creek HS - SAMP (EXPEDITED) - TAKA- PO APPROVAL
fuzzy · 75% · only TAKA task for job 25-213
1 candidate
|
none → May 04, 2026
TAKA: 2026-05-04 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| Batch 22 · SZXCHI65005Y · ETA to DALLAS | |||||||||
| 190 |
24-075 - -Cube Picket Mock Up
DFW CTAE AREA C4 EXTERIOR · Cube Picket Mock Up
PO 24-075-019
1 note
|
AIR |
24-075 - DFW CTAE - AREA C4 - EXTERIOR PICKET- IP1 Pending Panel AML -TAKA
fuzzy · 83% · description similarity
3 candidates
|
Aug 18, 2026 | Aug 03, 2026 |
Sep 10, 2026 → May 22, 2026
-111d
TAKA: 2026-05-22 to DALLAS
|
On track
83d slack |
Never |
Needs review
|
| Batch 24 · SZXCHI65007Y · ETA to DALLAS | |||||||||
| 205 |
24-040 -- 2MP2 insert
Project Meadow - PH2 Aluminum · INSERT
PO 24-040-026
|
AIR |
24-040 - Project Meadow - 2P02 - TAKA
fuzzy · 84% · task title has no pack code to confirm 2MP2
3 candidates
|
Nov 20, 2026 | Nov 13, 2026 |
Nov 16, 2026 → May 28, 2026
-172d
TAKA: 2026-05-28 to DALLAS
|
On track
171d slack |
Never |
Needs review
|
| Batch 25 · SZXLAX65277X · ETA to LA | |||||||||
| 209 |
25-033 - - MP1 (part of materails)
East Montgomery - Glass stair · mirror finish tube
PO NA
1 note
|
OCEAN |
25-033 - East Montgomery - Stair 6 Remakes MP1 (Missing Materials) - TAKA
fuzzy · 90% · job 25-033 + pack MP1
3 candidates
|
Nov 20, 2026 | Nov 13, 2026 |
Nov 16, 2026 → Jun 16, 2026
-153d
TAKA: 2026-06-02 to LA
|
On track
157d slack |
Never |
Needs review
|
| Batch 26 · SZXLAX65356X · ETA to LA | |||||||||
| 215 |
25-033 - - MP1 ( 77pcs WP104VC)
East Montgomery - Glass stair · mirror finish tube
PO NA
1 note
|
OCEAN |
25-033 - East Montgomery - Stair 6 Remakes MP1 (Missing Materials) - TAKA
fuzzy · 90% · job 25-033 + pack MP1
3 candidates
|
Nov 20, 2026 | Nov 13, 2026 |
Nov 16, 2026 → Jun 25, 2026
-144d
TAKA: 2026-06-11 to LA
|
On track
148d slack |
Never |
Needs review
|
| 221 |
25-038 - - MP1
East Dallas Government Center · SOLO POST
PO 25-038-010
|
OCEAN |
25-038 - East Dallas - G08 - TAKA
fuzzy · 84% · task title has no pack code to confirm MP1
2 candidates
|
Nov 10, 2026 | Nov 03, 2026 |
Nov 16, 2026 → Jun 25, 2026
-144d
TAKA: 2026-06-11 to LA
|
On track
138d slack |
Never |
Needs review
|
| 222 |
25-115 - - MP1( parts of materails)
Garden City High School · BEACON -FSR POST---PC COLOR
PO 25-115-005
1 note
|
OCEAN |
25-115 - Garden City - P02 - MP1 Remake -TAKA
fuzzy · 90% · job 25-115 + pack MP1
2 candidates
|
Nov 13, 2026 | Nov 06, 2026 |
Nov 02, 2026 → Jun 25, 2026
-130d
TAKA: 2026-06-11 to LA
|
On track
141d slack |
Never |
Needs review
|
| Batch 28 · SZXCHI65008Y · ETA to DALLAS | |||||||||
| 229 |
24-040 -2MP2 - 2CN01
Project Meadow · CONNECTOR
PO 24-020-024
|
AIR |
24-040 - Project Meadow - 2P02 - TAKA
fuzzy · 84% · task title has no pack code to confirm 2MP2
3 candidates
|
Nov 20, 2026 | Nov 13, 2026 |
Nov 16, 2026 → May 31, 2026
-169d
TAKA: 2026-05-31 to DALLAS
|
On track
167d slack |
Never |
Needs review
|
| 232 |
24-201 3MP2 (Except 1pc 24201-3P02R1)
McDaniel - PHASE 3 · CABLE POST
PO 24-021-016
1 note
|
AIR |
24-201 - McDaniel
fuzzy · 84% · task title has no pack code to confirm 3MP2
1 candidate
|
none → May 31, 2026
TAKA: 2026-05-31 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| Batch 29 · SZXLAX66085X · ETA to LA | |||||||||
| 236 |
25-033 - - MP1 ( 3PCS TU38.1x1.8-17)
East Montgomery - Glass stair · mirror finish tube
PO 25-033-006
1 note
|
OCEAN |
25-033 - East Montgomery - Stair 6 Remakes MP1 (Missing Materials) - TAKA
fuzzy · 90% · job 25-033 + pack MP1
3 candidates
|
Nov 20, 2026 | Nov 13, 2026 |
Nov 16, 2026 → Jul 02, 2026
-137d
TAKA: 2026-06-18 to LA
|
On track
141d slack |
Never |
Needs review
|
| 237 |
25-115 - - MP1 (Balance materails)
Garden City High School · BEACON -FSR POST---PC COLOR
PO 25-115-005
1 note
|
OCEAN |
25-115 - Garden City - P02 - MP1 Remake -TAKA
fuzzy · 90% · job 25-115 + pack MP1
2 candidates
|
Nov 13, 2026 | Nov 06, 2026 |
Nov 02, 2026 → Jul 02, 2026
-123d
TAKA: 2026-06-18 to LA
|
On track
134d slack |
Never |
Needs review
|
| 250 |
ST26010(P.O.NO:002944)
Offshore Stock Order 2026 · Offshore Stock Order 2026
PO 002944
4 notes
|
OCEAN |
April Offshore Stock Order 2026 - Offshore Stock Order 2026
po · 100% · PO 002944
|
none → Jul 02, 2026
TAKA: 2026-06-18 to LA
|
Not assessed | Never |
Needs review
|
||
| Batch 30 · SZXLAX66099X · ETA to LA | |||||||||
| 254 |
25-038 -- GP1
East Dallas Government Center · CERAMIC FRIT GLASS
PO 25-038-009
|
OCEAN |
25-038 - East Dallas - G08 - TAKA
fuzzy · 84% · task title has no pack code to confirm GP1
2 candidates
|
Nov 10, 2026 | Nov 03, 2026 |
Nov 16, 2026 → Jul 07, 2026
-132d
TAKA: 2026-06-23 to LA
|
On track
126d slack |
Never |
Needs review
|
| 259 |
TSC-ST26010 PO.No.002944
April Offshore Stock · STOCK ORDER
PO 002944
3 notes
|
OCEAN |
April Offshore Stock Order 2026 - Offshore Stock Order 2026
po · 100% · PO 002944
|
none → Jul 07, 2026
TAKA: 2026-06-23 to LA
|
Not assessed | Never |
Needs review
|
||
| Batch 31 · SZXCHI66002Y · ETA to DALLAS | |||||||||
| 261 |
25-118 - - Mock Up
NWISD · VORTEX POST
PO 25-118-009
|
AIR |
25-118 - NWISD - PICKET MOCK-UP #2 - TAKA
fuzzy · 74% · description similarity; close runner-up
3 candidates
|
Nov 20, 2026 | Nov 13, 2026 |
Nov 23, 2026 → Jun 11, 2026
-165d
TAKA: 2026-06-11 to DALLAS
|
On track
157d slack |
Never |
Needs review
|
| 264 |
25-051 - - Mock Up
Ball State Performing Arts Center · MOCK UP --SW7048
PO 25-051-004
1 note
|
AIR |
25-051 - Ball State Performing Arts Center - IP1 - TAKA
fuzzy · 94% · description similarity
2 candidates
|
Nov 02, 2026 | Oct 19, 2026 |
Oct 12, 2026 → Jun 11, 2026
-123d
TAKA: 2026-06-11 to DALLAS
|
On track
139d slack |
Never |
Needs review
|
| Batch 32 · SZXLAX66099X · ETA to LA | |||||||||
| 271 |
25-038 -- GP1 (Except 1pc 25038-G08 )
East Dallas Government Center · CERAMIC FRIT GLASS
PO 25-038-009
|
OCEAN |
25-038 - East Dallas - G08 - TAKA
fuzzy · 84% · task title has no pack code to confirm GP1
2 candidates
|
Nov 10, 2026 | Nov 03, 2026 |
Nov 16, 2026 → Jul 07, 2026
-132d
TAKA: 2026-06-23 to LA
|
On track
126d slack |
Never |
Needs review
|
| 277 |
TSC-ST26010 PO.No.002944
April Offshore Stock · STOCK ORDER
PO 002944
3 notes
|
OCEAN |
April Offshore Stock Order 2026 - Offshore Stock Order 2026
po · 100% · PO 002944
|
none → Jul 07, 2026
TAKA: 2026-06-23 to LA
|
Not assessed | Never |
Needs review
|
||
| Batch 33 · SZXCHI66003Y · ETA to DALLAS | |||||||||
| 283 |
24-201 3MP2 (balance 1pc 24201-3P02R1)
McDaniel - PHASE 3 · CABLE POST
PO 24-021-016
1 note
|
AIR |
24-201 - McDaniel
fuzzy · 84% · task title has no pack code to confirm 3MP2
1 candidate
|
none → Jun 14, 2026
TAKA: 2026-06-14 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| 284 |
24-201 - - 3MP3
McDaniel · BENT TUBE
PO 24-201-017
1 note
|
AIR |
24-201 - McDaniel
fuzzy · 84% · task title has no pack code to confirm 3MP3
1 candidate
|
none → Jun 14, 2026
TAKA: 2026-06-14 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| 285 |
24-040 - Mock Up
Project Meadow - · MOCK UP--steel PC35
PO 24-040-027
|
AIR |
24-040 - Project Meadow -2MP7 - TAKA
fuzzy · 85% · description similarity; close runner-up
3 candidates
|
Nov 13, 2026 | Nov 10, 2026 |
Nov 23, 2026 → Jun 14, 2026
-162d
TAKA: 2026-06-14 to DALLAS
|
On track
146d slack |
Never |
Needs review
|
| Batch 34 · SZXCHI66004Y · ETA to DALLAS | |||||||||
| 291 |
25-029 - - Mock Up
Richardson City Hall · SS316 SOLO POST-11pcs
PO 25-029-002
|
AIR |
25-029 - Richardson - MP1 - TAKA
fuzzy · 83% · description similarity; close runner-up
3 candidates
|
Nov 30, 2026 | Nov 09, 2026 |
Nov 23, 2026 → Jun 25, 2026
-151d
TAKA: 2026-06-25 to DALLAS
|
On track
152d slack |
Never |
Needs review
|
| 292 |
26-046 Mock Up
Cobb Galleria · With Dark Granite for the 43"h mockup and Pure clear anodized for the 14" h version
PO 26-046-002
|
AIR |
26-046 Cobb Galleria - IP1 - TAKA
fuzzy · 87% · description similarity; close runner-up
2 candidates
|
Oct 15, 2026 | Oct 01, 2026 |
Oct 28, 2026 → Jun 25, 2026
-125d
TAKA: 2026-06-25 to DALLAS
|
On track
106d slack |
Never |
Needs review
|
| 293 |
25-203 - - TAKA
J Marshall HS - COLOR SAMPLE · COLOR Sample -SW6070
PO 25-203-001
1 note
|
AIR |
25-203 - J Marshall HS - MP1 - TAKA
fuzzy · 87% · only TAKA task for job 25-203
1 candidate
|
Nov 11, 2026 | Oct 20, 2026 |
Nov 04, 2026 → Jun 25, 2026
-132d
TAKA: 2026-06-25 to DALLAS
|
On track
133d slack |
Never |
Needs review
|
| Batch 35 · SZXLAX66302X · ETA to LA | |||||||||
| 312 |
TSC-ST26010 PO.No.002944
April Offshore Stock · STOCK ORDER
PO 002944
3 notes
|
OCEAN |
April Offshore Stock Order 2026 - Offshore Stock Order 2026
po · 100% · PO 002944
|
none → Jul 14, 2026
TAKA: 2026-06-30 to LA
|
Not assessed | Never |
Needs review
|
||
| Batch 36 · SZXLAX66386X · ETA to LA | |||||||||
| 318 |
25-038 -- GP1 (balance 1pc )
East Dallas Government Center · CERAMIC FRIT GLASS
PO 25-038-009
|
OCEAN |
25-038 - East Dallas - G08 - TAKA
fuzzy · 84% · task title has no pack code to confirm GP1
2 candidates
|
Nov 10, 2026 | Nov 03, 2026 |
Nov 16, 2026 → Jul 21, 2026
-118d
TAKA: 2026-07-07 to LA
|
On track
112d slack |
Never |
Needs review
|
| Batch 37 · SZXLAX67036X · ETA to LA | |||||||||
| 330 |
24-040 - - 2MP3
Project Meadow - PH2 Aluminum · Aluminum post--PC40
PO NA
|
OCEAN |
24-040 - Project Meadow - 2P02 - TAKA
fuzzy · 84% · task title has no pack code to confirm 2MP3
3 candidates
|
Nov 20, 2026 | Nov 13, 2026 |
Nov 16, 2026 → Aug 07, 2026
-101d
TAKA: 2026-07-24 to LA
|
On track
105d slack |
Never |
Needs review
|
| 334 |
TSC-ST26010 PO.No.002944
April Offshore Stock · STOCK ORDER
PO 002944
3 notes
|
OCEAN |
April Offshore Stock Order 2026 - Offshore Stock Order 2026
po · 100% · PO 002944
|
none → Aug 07, 2026
TAKA: 2026-07-24 to LA
|
Not assessed | Never |
Needs review
|
||
| Batch 39 · SZXCHI67001Y · ETA to DALLAS | |||||||||
| 346 |
26-086 -Mock Up
TCAT Memphis - FOLD - Mock Up · mock up--MC75
PO 26-086-001
1 note
|
AIR |
26-086 - TCAT Memphis - MP1 -TAKA
fuzzy · 86% · only TAKA task for job 26-086
1 candidate
|
Sep 25, 2026 | Sep 18, 2026 |
Sep 14, 2026 → Jul 05, 2026
-71d
TAKA: 2026-07-05 to DALLAS
|
On track
79d slack |
Never |
Needs review
|
| 347 |
25-049 - - Mock Up
Redding Rancheria - STRUC · mock up--MC73
PO 25-049-002
1 note
|
AIR |
25-049 - Redding Rancheria - IP1 - TAKA
fuzzy · 90% · description similarity
3 candidates
|
Dec 18, 2026 | Dec 04, 2026 |
Dec 22, 2026 → Jul 05, 2026
-170d
TAKA: 2026-07-05 to DALLAS
|
On track
163d slack |
Never |
Needs review
|
| Batch 40 · SZXCHI67002Y · ETA to DALLAS | |||||||||
| 357 |
25-041 GP1 Remake
Jackson Walker · GLASS
PO 25-041-027
1 note
|
AIR |
25-041 - Jackson Walker - GP1 Remake- TAKA
po · 100% · PO 25-041-027
|
Jun 24, 2026 | Jun 17, 2026 |
Oct 08, 2026 → Jul 06, 2026
-94d
TAKA: 2026-07-06 to DALLAS
|
At risk: Need By
-17d slack |
Never |
Needs review
|
| 366 |
26-028 -Beacon Mesh Mock Up
Sapulpa High School · Beacon Mesh Mock Up
PO 26-028-001
|
AIR |
26-028 - Sapulpa High School - GP1 - TAKA
fuzzy · 90% · description similarity; close runner-up
3 candidates
|
Nov 06, 2026 | Oct 30, 2026 |
Nov 23, 2026 → Jul 06, 2026
-140d
TAKA: 2026-07-06 to DALLAS
|
On track
118d slack |
Never |
Needs review
|
| Batch 41 · SZXCHI67003Y · ETA to DALLAS | |||||||||
| 371 |
TSC-ST26029 (only sent aluminum 1/8" mill finish firsstly )
Panelscape sample · Panelscape sample
PO VS2026-025
3 notes
|
AIR |
Panelscape samples 2"x2"
po · 100% · PO VS2026-025
|
Jul 13, 2026 → Jul 10, 2026
-3d
TAKA: 2026-07-10 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| 372 |
25-050 - Infill Pack 1 Remakes
Cheshire Elementary School · ALU PNAEL -3 color
PO 25-050-010
2 notes
|
AIR |
25-050 - Cheshire Elementary School - Infill Pack 1 - Remake panels
fuzzy · 90% · job 25-050 + pack IP1; close runner-up
3 candidates
|
Apr 28, 2026 → Jul 10, 2026
+73d
TAKA: 2026-07-10 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| 375 |
24-020 Brackets
LHHS#2 · Brackets
PO 24-020-054
2 notes
|
AIR |
24-020 - LHHS#2 - 3IP3 -TAKA
fuzzy · 71% · description similarity; close runner-up
2 candidates
|
Dec 17, 2026 | Dec 10, 2026 |
Dec 04, 2026 → Jul 10, 2026
-147d
TAKA: 2026-07-10 to DALLAS
|
Not assessed | Never |
Needs review
|
| 376 |
26-028 Beacon Glass Mock Up
Sapulpa High School · Beacon Glass Mock Up
PO 26-028-002
2 notes
|
AIR |
26-028 - Sapulpa High School - GP1 - TAKA
fuzzy · 90% · description similarity; close runner-up
3 candidates
|
Nov 06, 2026 | Oct 30, 2026 |
Nov 23, 2026 → Jul 10, 2026
-136d
TAKA: 2026-07-10 to DALLAS
|
Not assessed | Never |
Needs review
|
| Batch 42 · SZXCHI67004Y · ETA to DALLAS | |||||||||
| 385 |
26-062 - - Mock Up
TAMU COD - Gaston Entry · MOCK UP
PO 26-062-001
|
AIR |
26-062 - TAMU COD- MP2- TAKA
fuzzy · 80% · only TAKA task for job 26-062
1 candidate
|
Oct 21, 2026 | Oct 07, 2026 |
Oct 22, 2026 → Jul 13, 2026
-101d
TAKA: 2026-07-13 to DALLAS
|
On track
94d slack |
Never |
Needs review
|
| Batch 46 · SZXLAX67350X · ETA to LA | |||||||||
| 418 |
25-029 MP1
Richardson City Hall · FSR POST
PO 25-029-003
1 note
|
OCEAN |
25-029 - Richardson - MP1 - TAKA
fuzzy · 100% · job 25-029 + pack MP1
3 candidates
|
Nov 30, 2026 | Nov 09, 2026 |
Nov 23, 2026 → Aug 20, 2026
-95d
TAKA: 2026-08-06 to LA
|
On track
102d slack |
Never |
Needs review
|
| Batch 47 · SZXLAX68039X · ETA to LA | |||||||||
| 433 |
24-075 -- MP5
DFW CTAE · PNAEL FRAME PLATE
PO 24-075-023
1 note
|
OCEAN |
24-075 - DFW CTAE - AREA C4 - EXTERIOR PICKET- IP1 Pending Panel AML -TAKA
po · 100% · PO 24-075-023
|
Aug 18, 2026 | Aug 03, 2026 |
Sep 10, 2026 → Aug 28, 2026
-13d
TAKA: 2026-08-14 to LA
|
At risk: LA + Need By
-10d slack |
Never |
Needs review
|
| Batch 49 · SZXCHI67008Y · ETA to DALLAS | |||||||||
| 443 |
25-076 - - IP4
Norton ES · Aluminum frame panel
PO NA
1 note
|
AIR |
25-076 - Norton ES - IP4 Remake - TAKA- PO APPROVAL
fuzzy · 90% · job 25-076 + pack IP4; close runner-up
2 candidates
|
Oct 20, 2026 |
none → Jul 29, 2026
TAKA: 2026-07-29 to DALLAS
|
Not assessed | Never |
Needs review
|
|
| 445 |
24-040 - 2MP4 ( sent 2CN12 fristly)
Project Meadow - Ph2 level 8 · FITTINGS
PO 24-040-029
|
AIR |
24-040 - Project Meadow - 2P02 - TAKA
fuzzy · 84% · task title has no pack code to confirm 2MP4
3 candidates
|
Nov 20, 2026 | Nov 13, 2026 |
Nov 16, 2026 → Jul 29, 2026
-110d
TAKA: 2026-07-29 to DALLAS
|
On track
108d slack |
Never |
Needs review
|
| Batch 50 · SZXCHI68001Y · ETA to DALLAS | |||||||||
| 450 |
24-040 - 2MP4 ( balance 2CN13)
Project Meadow - Ph2 level 8 · FITTINGS
PO 24-040-029
|
AIR |
24-040 - Project Meadow - 2P02 - TAKA
fuzzy · 84% · task title has no pack code to confirm 2MP4
3 candidates
|
Nov 20, 2026 | Nov 13, 2026 |
Nov 16, 2026 → Aug 04, 2026
-104d
TAKA: 2026-08-04 to DALLAS
|
On track
102d slack |
Never |
Needs review
|
| 451 |
24-040 - - 2IP2
Project Meadow - Ph2 level 8 · ALU PICKET PANEL
PO 24-040-030
|
AIR |
24-040 - Project Meadow - 2IP02 - TAKA
fuzzy · 90% · job 24-040 + pack 2IP2; close runner-up
3 candidates
|
Nov 20, 2026 | Nov 13, 2026 |
none → Aug 04, 2026
TAKA: 2026-08-04 to DALLAS
|
On track
102d slack |
Never |
Needs review
|
| 454 |
26-065 MOCKUP
VUMC Link - BEACON CABLE-NET - Mock Up · BEACON CABLE-NET - Mock Up
PO 26-065-001
2 notes
|
AIR |
26-065 - VUMC Link - BEACON CABLE-NET - Mock Up - TAKA- PO APPROVAL
po · 100% · PO 26-065-001
|
Aug 21, 2026 |
none → Aug 04, 2026
TAKA: 2026-08-04 to DALLAS
|
Not assessed | Never |
Needs review
|
|
| 457 |
25-041 - - GP1 Remake G09
Jackson Walker · BEND GLASS
PO NA
1 note
|
AIR |
25-041 - Jackson Walker - GP1 Remake- TAKA
fuzzy · 100% · job 25-041 + pack GP1
2 candidates
|
Jun 24, 2026 | Jun 17, 2026 |
Oct 08, 2026 → Aug 04, 2026
-65d
TAKA: 2026-08-04 to DALLAS
|
At risk: Need By
-47d slack |
Never |
Needs review
|
| 460 |
TSC-ST26029 (20pcs 14GA ZINC RICH primer)
Panelscape sample · Panelscape sample
PO VS2026-025
2 notes
|
AIR |
Panelscape samples 2"x2"
po · 100% · PO VS2026-025
|
Jul 13, 2026 → Aug 04, 2026
+22d
TAKA: 2026-08-04 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| 461 |
26-028 MOCK UP ( clamp FOR 21.52mm glass )
Sapulpa High School · Beacon Glass Mock Up
PO 26-028-002
|
AIR |
26-028 - Sapulpa High School - GP1 - TAKA
fuzzy · 90% · description similarity; close runner-up
3 candidates
|
Nov 06, 2026 | Oct 30, 2026 |
Nov 23, 2026 → Aug 04, 2026
-111d
TAKA: 2026-08-04 to DALLAS
|
On track
88d slack |
Never |
Needs review
|
| Batch 51 · SZXLAX68130X · ETA to LA | |||||||||
| 463 |
24-075 - IP1
DFW CTAE - AREA C4 - EXTERIOR PICKET- · SS316 PANEL FRAME
PO 24-075-022
1 note
|
OCEAN |
24-075 - DFW CTAE - AREA C4 (BRIDGES) - IP1 - TAKA- PO APPROVAL
fuzzy · 90% · job 24-075 + pack IP1; close runner-up
3 candidates
|
Sep 10, 2026 |
none → Sep 03, 2026
TAKA: 2026-08-20 to LA
|
On track | Never |
Needs review
|
|
| Batch 53 · DHL 7057327642 · ETA to DALLAS | |||||||||
| 479 |
25-142 MP1 GAEP121U
QTS DFW2 DC3 · GAEP121U
PO NA
2 notes
|
AIR |
25-142 - QTS DFW2 DC3 - MP1 - TAKA
fuzzy · 100% · job 25-142 + pack MP1
1 candidate
|
Aug 12, 2026 |
Aug 21, 2026 → Aug 14, 2026
-7d
TAKA: 2026-08-14 to DALLAS
|
Not assessed | Never |
Needs review
|
|
| 480 |
25-192 Anti Reflective Glass
WSVN 7 · GLASS SAMPLE
PO NA
|
AIR |
25-192 - WSVN 7 - MP1 - TAKA
fuzzy · 75% · description similarity
3 candidates
|
Oct 06, 2026 | Sep 22, 2026 |
Oct 01, 2026 → Aug 14, 2026
-48d
TAKA: 2026-08-14 to DALLAS
|
On track
50d slack |
Never |
Needs review
|
| 481 |
color sample for 24-075 IP1
DFW CTAE AREA C4 · color sample
PO NA
1 note
|
AIR |
24-075 - DFW CTAE - AREA C4 (BRIDGES) - IP1 - TAKA- PO APPROVAL
fuzzy · 90% · job 24-075 + pack IP1; close runner-up
3 candidates
|
Sep 10, 2026 |
none → Aug 14, 2026
TAKA: 2026-08-14 to DALLAS
|
Not assessed | Never |
Needs review
|
|
| Batch 54 · SZXLAX68319X · ETA to LA | |||||||||
| 483 |
TSC-ST26023 SAMPLE STOCK (part of materails)
SAMPLE STOCK · SAMPLE STOCK
PO VS2026-026
3 notes
|
OCEAN |
SAMPLE STOCK - TAKA
po · 100% · PO VS2026-026
|
Sep 24, 2026 → Sep 16, 2026
-8d
TAKA: 2026-09-02 to LA
|
Not assessed | Never |
Needs review
|
||
| Batch 58 · SZXLAX69067X · ETA to LA | |||||||||
| 521 |
24-075 - IP1
DFW CTAE AREA C4 · 12mm LASER CUT PANEL - PP11--color as sample
PO 24-075-027
2 notes
|
OCEAN |
24-075 - DFW CTAE - AREA C4 (BRIDGES) - IP1 - TAKA- PO APPROVAL
po · 100% · PO 24-075-027
|
Sep 10, 2026 |
none → Oct 01, 2026
TAKA: 2026-09-17 to LA
|
At risk: LA | Never |
Needs review
|
|
| 527 |
TSC-ST26023 SAMPLE STOCK (Balance Materails)
SAMPLE STOCK · SAMPLE STOCK
PO VS2026-026
3 notes
|
OCEAN |
SAMPLE STOCK - TAKA
po · 100% · PO VS2026-026
|
Sep 24, 2026 → Oct 01, 2026
+7d
TAKA: 2026-09-17 to LA
|
Not assessed | Never |
Needs review
|
||
| 529 |
24-040 -MP1 (Ship fittings firstly)
Project Meadow - PH4 Penthouse · ALU PANEL---PC40
PO 24-040-032
|
OCEAN |
24-040 - Project Meadow - 2P02 - TAKA
fuzzy · 84% · task title has no pack code to confirm MP1
3 candidates
|
Nov 20, 2026 | Nov 13, 2026 |
Nov 16, 2026 → Oct 01, 2026
-46d
TAKA: 2026-09-17 to LA
|
On track
50d slack |
Never |
Needs review
|
| Batch 59 · SZXCHI69002Y · ETA to DALLAS | |||||||||
| 531 |
25-041 - - GP1 Remake G09
Jackson Walker · BEND GLASS
PO NA
1 note
|
AIR |
25-041 - Jackson Walker - GP1 Remake- TAKA
fuzzy · 100% · job 25-041 + pack GP1
2 candidates
|
Jun 24, 2026 | Jun 17, 2026 |
Oct 08, 2026 → Sep 10, 2026
-28d
TAKA: 2026-09-10 to DALLAS
|
At risk: Need By
-84d slack |
Never |
Needs review
|
| 532 |
24-040 MP5
Project Meadow · SS316 CLADDING
PO 24-040-036
1 note
|
AIR |
24-040 - Project Meadow - MP5 Cladding - TAKA- PO APPROVAL
fuzzy · 90% · job 24-040 + pack MP5; close runner-up
3 candidates
|
Sep 04, 2026 |
none → Sep 10, 2026
TAKA: 2026-09-10 to DALLAS
|
Not assessed | Never |
Needs review
|
|
| 537 |
26-086 - - MP1
TCAT Memphis · FOLD POST-SS316/304
PO 26-086-003
1 note
|
AIR |
26-086 - TCAT Memphis - MP1 -TAKA
fuzzy · 100% · job 26-086 + pack MP1
1 candidate
|
Sep 25, 2026 | Sep 18, 2026 |
Sep 14, 2026 → Sep 10, 2026
-4d
TAKA: 2026-09-10 to DALLAS
|
On track
9d slack |
Never |
Needs review
|
| 538 |
24-040 2MP5 (Ship 24040-2CN01 and 24040-2SL firstly)
Project Meadow - PH2 Level 10 · ALU POST
PO 24-040-034
|
AIR |
24-040 - Project Meadow - 2P02 - TAKA
fuzzy · 84% · task title has no pack code to confirm 2MP5
3 candidates
|
Nov 20, 2026 | Nov 13, 2026 |
Nov 16, 2026 → Sep 10, 2026
-67d
TAKA: 2026-09-10 to DALLAS
|
On track
65d slack |
Never |
Needs review
|
| Batch 60 · SZXLAX69152X · ETA to LA | |||||||||
| 541 |
24-040 -MP1
Project Meadow - PH4 Penthouse · ALU PANEL---PC40
PO 24-040-032
|
OCEAN |
24-040 - Project Meadow - 2P02 - TAKA
fuzzy · 84% · task title has no pack code to confirm MP1
3 candidates
|
Nov 20, 2026 | Nov 13, 2026 |
Nov 16, 2026 → Oct 08, 2026
-39d
TAKA: 2026-09-24 to LA
|
On track
43d slack |
Never |
Needs review
|
| 543 |
26-061 Metal Pack 1
Warriors FH · VORTEX POST
PO 26-061-002
|
OCEAN |
No task
PO 26-061-002 is on 2 tasks
2 candidates
|
none → Oct 08, 2026
TAKA: 2026-09-24 to LA
|
Not assessed | Never |
Needs review
|
||
| 544 |
25-125 -- GP1 (except 2pc 25125-G29-V1 & 1pc 25125-G11-V1)
CACC Aviation Hangar · GLASS
PO 25-125-005
1 note
|
OCEAN |
25-125 - CACC Aviation Hangar - GP1 -TAKA
po · 100% · PO 25-125-005
|
Oct 06, 2026 | Sep 22, 2026 |
Oct 22, 2026 → Oct 08, 2026
-14d
TAKA: 2026-09-24 to LA
|
At risk: LA + Need By
-2d slack |
Never |
Needs review
|
| 547 |
TSC-ST26023 SAMPLE STOCK (Balance 1pc PG-11)
SAMPLE STOCK · SAMPLE STOCK
PO VS2026-026
3 notes
|
OCEAN |
SAMPLE STOCK - TAKA
po · 100% · PO VS2026-026
|
Sep 24, 2026 → Oct 08, 2026
+14d
TAKA: 2026-09-24 to LA
|
Not assessed | Never |
Needs review
|
||
| Batch 62 · SZXCHI69003Y · ETA to DALLAS | |||||||||
| 556 |
25-038 - GP1 REMAKE
East Dallas Government Center · GLASS
PO 25-038-011
|
AIR |
25-038 - East Dallas - G08 - TAKA
fuzzy · 84% · task title has no pack code to confirm GP1
2 candidates
|
Nov 10, 2026 | Nov 03, 2026 |
Nov 16, 2026 → Sep 20, 2026
-57d
TAKA: 2026-09-20 to DALLAS
|
On track
45d slack |
Never |
Needs review
|
| 558 |
24-040 - - 2IP3
Project Meadow - PH2 Level 10 · ALU PICKET PANEL 48.3
PO 24-040-035
|
AIR |
24-040 - Project Meadow - 2P02 - TAKA
fuzzy · 84% · task title has no pack code to confirm 2IP3
3 candidates
|
Nov 20, 2026 | Nov 13, 2026 |
Nov 16, 2026 → Sep 20, 2026
-57d
TAKA: 2026-09-20 to DALLAS
|
On track
55d slack |
Never |
Needs review
|
| 559 |
24-040 2MP5
Project Meadow - PH2 Level 10 · ALU POST
PO 24-040-034
|
AIR |
24-040 - Project Meadow - 2P02 - TAKA
fuzzy · 84% · task title has no pack code to confirm 2MP5
3 candidates
|
Nov 20, 2026 | Nov 13, 2026 |
Nov 16, 2026 → Sep 20, 2026
-57d
TAKA: 2026-09-20 to DALLAS
|
On track
55d slack |
Never |
Needs review
|
| 565 |
25-149 MP1
New Albany · ALU FRAME POST---PC41
PO 25-149-001
2 notes
|
AIR |
25-149 - New Albany - MP1 - TAKA- PO APPROVAL
fuzzy · 90% · job 25-149 + pack MP1
1 candidate
|
none → Sep 20, 2026
TAKA: 2026-09-20 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| 568 |
TSC-ST26036
SAMPLE STOCK ORDER #2 - 082126 TAKA · ALU PANEL---20pcs each by air
PO VS2026-034
2 notes
|
AIR |
SAMPLE STOCK ORDER #2 - TAKA
po · 100% · PO VS2026-034
|
Oct 28, 2026 → Sep 20, 2026
-38d
TAKA: 2026-09-20 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| Batch 63 · SZXLAX69368X · ETA to LA | |||||||||
| 572 |
24-212 1MP1 (except TU38.1X1.8--104EA)
CISD - Crowley High School - Texas - Phase 2, Arena B&C · CIRCA -FSR POST
PO 24-212-014
|
OCEAN |
No task
PO 24-212-014 is on 2 tasks
|
none → Oct 22, 2026
TAKA: 2026-10-08 to LA
|
Not assessed | Never |
Needs review
|
||
| 575 |
25-155 MP1 (excpet WP100DC-90EA)
Del Norte · BLADE POST
PO 25-155-003
1 note
|
OCEAN |
25-155 - Del Norte - MP1 -TAKA
po · 100% · PO 25-155-003
|
Nov 02, 2026 | Oct 19, 2026 |
Oct 28, 2026 → Oct 22, 2026
-6d
TAKA: 2026-10-08 to LA
|
On track
11d slack |
Never |
Needs review
|
| 577 |
26-061 -- MP1 ADDITION
Warriors FH · BEACON POST
PO 26-061-002
|
OCEAN |
No task
PO 26-061-002 is on 2 tasks
2 candidates
|
none → Oct 22, 2026
TAKA: 2026-10-08 to LA
|
Not assessed | Never |
Needs review
|
||
| Batch 64 · SZXLAX69483X · ETA to LA | |||||||||
| 582 |
25-096 3GP1 (balance parts)
Cicero North HS Pool · 21.52pvb glass
PO 25-096-002
1 note
|
OCEAN |
25-096 - Cicero North HS Pool - 3GP1 - TAKA
fuzzy · 100% · job 25-096 + pack 3GP1
2 candidates
|
Oct 22, 2026 | Oct 08, 2026 |
Oct 22, 2026 → Oct 28, 2026
+6d
TAKA: 2026-10-14 to LA
|
At risk: LA + Need By
-6d slack |
Never |
Needs review
|
| 584 |
24-212 1MP1 (Balance TU38.1X1.8--104EA)
CISD - Crowley High School - Texas - Phase 2, Arena B&C · CIRCA -FSR POST
PO 24-212-014
|
OCEAN |
No task
PO 24-212-014 is on 2 tasks
|
none → Oct 28, 2026
TAKA: 2026-10-14 to LA
|
Not assessed | Never |
Needs review
|
||
| 591 |
25-145- MP1
Kingsport Library · FLAT BAR POST
PO 26-155-003
1 note
|
OCEAN |
25-145 Kingsport Library - MP1 - TAKA
container · 97% · job 25-145 + container SZXLAX69483X
|
Oct 30, 2026 | Oct 16, 2026 |
none → Oct 28, 2026
TAKA: 2026-10-14 to LA
|
On track
2d slack |
Never |
Needs review
|
| 592 |
25-203 - - MP1 (Except PB105FL)
J Marshall HS · FOLD POST
PO NA
1 note
|
OCEAN |
25-203 - J Marshall HS - MP1 - TAKA
container · 97% · job 25-203 + container SZXLAX69483X
|
Nov 11, 2026 | Oct 20, 2026 |
Nov 04, 2026 → Oct 28, 2026
-7d
TAKA: 2026-10-14 to LA
|
On track
14d slack |
Never |
Needs review
|
| Batch 66 · SZXCHI69005Y · ETA to DALLAS | |||||||||
| 601 |
25-051 - - MP1
Ball State Performing Arts Center- EXPEDITED (POST) · STRUC POST
PO 25-051-006
2 notes
|
AIR |
25-051 - Ball State Performing Arts Center- EXPEDITED (POST)- MP1 - TAKA- PO APPROVAL
po · 100% · PO 25-051-006
|
Sep 29, 2026 |
none → Sep 29, 2026
TAKA: 2026-09-29 to DALLAS
|
Not assessed | Never |
Needs review
|
|
| 602 |
TSC-ST26032 Color Chip Samples ( Ship parts firstly )
Color Chip Samples · Color Chip Samples
PO VS2026-031
2 notes
|
AIR |
Taka Order - Color Chip Samples - 8-10-2026
po · 100% · PO VS2026-031
|
Oct 28, 2026 → Sep 29, 2026
-29d
TAKA: 2026-09-29 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| Batch 67 · SZXLAX6A088X · ETA to LA | |||||||||
| 607 |
25-155 - IP1
Del Norte - · PERFORATED PANEL
PO 25-155-002
|
OCEAN |
No task
PO 25-155-002 is on 2 tasks
2 candidates
|
none → Nov 04, 2026
TAKA: 2026-10-21 to LA
|
Not assessed | Never |
Needs review
|
||
| Batch 68 · flight booked SZXCHI6A001Y · ETA to DALLAS | |||||||||
| 618 |
25-213 sample
Waxahachie ISD Creek HS · SS PANEL SAMPLE
PO 25-213-003
2 notes
|
AIR |
25-213 - Waxahachie ISD Creek HS - SAMP (EXPEDITED) - TAKA- PO APPROVAL
po · 100% · PO 25-213-003
|
none → Oct 05, 2026
TAKA: 2026-10-05 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| Batch 69 · DHL 11 2151 9350 · ETA to DALLAS | |||||||||
| 622 |
26-061 MP1
Warrior MP1 · BP150BC-V2
PO 26-061-003
2 notes
|
AIR |
26-061 - Warriors FH - MP1 - BP150BC-V2 - TAKA
po · 100% · PO 26-061-003
|
Oct 02, 2026 | Oct 02, 2026 |
Oct 06, 2026 → Oct 05, 2026
-1d
TAKA: 2026-10-05 to DALLAS
|
Not assessed | Never |
Needs review
|
| Batch 70 · SZXCHI6A002Y · ETA to DALLAS | |||||||||
| 627 |
25-051 - - IP1
Ball State Performing Arts Center · 10MM Aluminum panel--SW7048
PO 25-051-005
1 note
|
AIR |
25-051 - Ball State Performing Arts Center - IP1 - TAKA
po · 100% · PO 25-051-005
|
Nov 02, 2026 | Oct 19, 2026 |
Oct 12, 2026 → Oct 09, 2026
-3d
TAKA: 2026-10-09 to DALLAS
|
On track
23d slack |
Never |
Needs review
|
| Batch 71 · SZXLAX6A132X · ETA to LA | |||||||||
| 636 |
26-081 - - IP1
Stanford CHS · PERFORATED PANEL
PO 26-081-001
|
OCEAN |
No task
PO 26-081-001 is on 2 tasks
2 candidates
|
none → Nov 10, 2026
TAKA: 2026-10-27 to LA
|
Not assessed | Never |
Needs review
|
||
| Batch 72 · SZXCHI6A003Y · ETA to DALLAS | |||||||||
| 643 |
26-127 Mock Up
Gainesville PD · Mock Up ---RAL5022
PO 26-127-001
1 note
|
AIR |
26-127 - Gainesville PD - Mock Up - TAKA
po · 100% · PO 26-127-001
|
Oct 08, 2026 | Sep 30, 2026 |
Oct 22, 2026 → Oct 15, 2026
-7d
TAKA: 2026-10-15 to DALLAS
|
At risk: Need By
-13d slack |
Never |
Needs review
|
| 645 |
25-041- GP1
Jackson Walker · BEND GLASS
PO NA
1 note
|
AIR |
25-041 - Jackson Walker - GP1 Remake- TAKA
fuzzy · 90% · job 25-041 + pack GP1
2 candidates
|
Jun 24, 2026 | Jun 17, 2026 |
Oct 08, 2026 → Oct 15, 2026
+7d
TAKA: 2026-10-15 to DALLAS
|
At risk: Need By
-119d slack |
Never |
Needs review
|
| 646 |
25-038 -GP2
East Dallas · GLASS
PO 25-038-012
|
AIR |
25-038 - East Dallas - G08 - TAKA
fuzzy · 84% · task title has no pack code to confirm GP2
2 candidates
|
Nov 10, 2026 | Nov 03, 2026 |
Nov 16, 2026 → Oct 15, 2026
-32d
TAKA: 2026-10-15 to DALLAS
|
On track
20d slack |
Never |
Needs review
|
| 648 |
26-076 - - Mock Up
Prairie SS Center - Blade SM · Blade WM- Mock Up
PO 26-076-002
2 notes
|
AIR |
26-076 - Prairie SS Center - Blade WM- Mock Up - TAKA- PO APPROVAL
po · 100% · PO 26-076-002
|
Oct 16, 2026 |
none → Oct 15, 2026
TAKA: 2026-10-15 to DALLAS
|
Not assessed | Never |
Needs review
|
|
| 649 |
26-076 -- Mock Up (except glass)
Prairie SS Center - Blade GLASS · Blade Glass - Mock Up
PO 26-076-001
1 note
|
AIR |
26-076 - Prairie SS Center - Blade Glass - Mock Up - TAKA
po · 100% · PO 26-076-001
|
Oct 23, 2026 | Oct 16, 2026 |
Oct 22, 2026 → Oct 15, 2026
-7d
TAKA: 2026-10-15 to DALLAS
|
On track
2d slack |
Never |
Needs review
|
| Batch 73 · SZXLAX6A235X · ETA to LA | |||||||||
| 654 |
25-206 2IP1
Newman Smith HS - Stair 4 · wire mesh panel
PO 25-206-004
|
OCEAN |
No task
PO 25-206-004 is on 2 tasks
2 candidates |
none → Nov 21, 2026
TAKA: 2026-11-07 to LA
|
Not assessed | Never |
Needs review
|
||
| 656 |
26-088 AML (Sent 3" SQ.TUBE firstly)
Eastern Hills · FITTINGS
PO 26-088-004
1 note
|
OCEAN |
26-088 - Eastern Hills - AML - TAKA
po · 100% · PO 26-088-004
|
Nov 20, 2026 | Nov 06, 2026 |
Nov 23, 2026 → Nov 21, 2026
-2d
TAKA: 2026-11-07 to LA
|
At risk: LA + Need By
-1d slack |
Never |
Needs review
|
| Batch 74 · flight booked · ETA to DALLAS | |||||||||
| 663 |
26-076 -- Mock Up (only glass)
Prairie SS Center - Blade GLASS · Blade Glass - Mock Up
PO 26-076-001
1 note
|
AIR |
26-076 - Prairie SS Center - Blade Glass - Mock Up - TAKA
po · 100% · PO 26-076-001
|
Oct 23, 2026 | Oct 16, 2026 |
Oct 22, 2026 → Oct 25, 2026
+3d
TAKA: 2026-10-25 to DALLAS
|
At risk: Need By
-8d slack |
Never |
Needs review
|
| 664 |
25-118 - SAMPLE (except 1pc)
NWISD · GLASS SAMPLE
PO 25-118-011
2 notes
|
AIR |
25-118 - NWISD - SAMP - TAKA
po · 100% · PO 25-118-011
|
Oct 09, 2026 |
Nov 02, 2026 → Oct 25, 2026
-8d
TAKA: 2026-10-25 to DALLAS
|
Not assessed | Never |
Needs review
|
|
| 666 |
26-089 - - SW7066
SUNY Morrisville · SW7066 color sample
PO 26-089-001
|
AIR |
26-089 - SUNY Morrisville - IP1 - TAKA
fuzzy · 89% · description similarity; close runner-up
3 candidates
|
Dec 01, 2026 | Nov 17, 2026 |
Dec 03, 2026 → Oct 25, 2026
-39d
TAKA: 2026-10-25 to DALLAS
|
On track
31d slack |
Never |
Needs review
|
| 667 |
26-102 -- Mock Up
Natatorium NR Dining · SHOE MOCK UP
PO 26-102-004
1 note
|
AIR |
26-102 - Natatorium NR Dining - Mock Up - SHOE - TAKA
po · 100% · PO 26-102-004
|
Oct 23, 2026 | Oct 16, 2026 |
Nov 02, 2026 → Oct 25, 2026
-8d
TAKA: 2026-10-25 to DALLAS
|
At risk: Need By
-8d slack |
Never |
Needs review
|
| 668 |
26-102 -- Mock Up
Natatorium NR Dining · CIRCA MOCK UP
PO 26-102-003
1 note
|
AIR |
26-102 - Natatorium NR Dining - Mock Up - CIRCA GLASS - TAKA
po · 100% · PO 26-102-003
|
Nov 02, 2026 | Oct 19, 2026 |
Nov 02, 2026 → Oct 25, 2026
-8d
TAKA: 2026-10-25 to DALLAS
|
On track
2d slack |
Never |
Needs review
|
| 669 |
26-058 - Mock Up
UAH - · beacon mock up
PO 26-058-001
1 note
|
AIR |
26-058 - UAH - Mock Up - TAKA
po · 100% · PO 26-058-001
|
Oct 30, 2026 | Oct 23, 2026 |
Nov 09, 2026 → Oct 25, 2026
-15d
TAKA: 2026-10-25 to DALLAS
|
At risk: Need By
-1d slack |
Never |
Needs review
|
| 670 |
24-200 - - 2MP3
North Carolina Education Campus · CONNECTOR
PO 24-200-019
1 note
|
AIR |
24-200 - North Carolina Education Campus - 2MP3 - TAKA
po · 100% · PO 24-200-019
|
Oct 30, 2026 | Oct 23, 2026 |
Nov 02, 2026 → Oct 25, 2026
-8d
TAKA: 2026-10-25 to DALLAS
|
At risk: Need By
-1d slack |
Never |
Needs review
|
| 672 |
26-122 - - MP1
Zipline Tenant Improvement · STRUC POST --PC30
PO 26-122-002
1 note
|
AIR |
26-122 - Zipline Tenant Improvement - MP1 - TAKA
po · 100% · PO 26-122-002
|
Nov 06, 2026 | Oct 30, 2026 |
Nov 09, 2026 → Oct 25, 2026
-15d
TAKA: 2026-10-25 to DALLAS
|
On track
6d slack |
Never |
Needs review
|
| 673 |
26-118 MOCK UP
LeTU CPUC · Wind wall - Mock Up
PO 26-118-001
1 note
|
AIR |
26-118 - LeTU CPUC - Wind wall - Mock Up - TAKA
po · 100% · PO 26-118-001
|
Nov 06, 2026 | Oct 30, 2026 |
Nov 02, 2026 → Oct 25, 2026
-8d
TAKA: 2026-10-25 to DALLAS
|
On track
6d slack |
Never |
Needs review
|
| 674 |
25-115 - - MP1 Remake
Garden City - P02 · P02 POST--PC36
PO 25-115-007
1 note
|
AIR |
25-115 - Garden City - P02 - MP1 Remake -TAKA
po · 100% · PO 25-115-007
|
Nov 13, 2026 | Nov 06, 2026 |
Nov 02, 2026 → Oct 25, 2026
-8d
TAKA: 2026-10-25 to DALLAS
|
On track
13d slack |
Never |
Needs review
|
| Batch 75 · no shipment # · ETA to DALLAS | |||||||||
| 676 |
25-075 - - IP2 remakes
UM Gem Factory · Cablenet PANEL
PO 25-075-007
1 note
|
AIR |
25-075 - UM Gem Factory - IP2 remakes - TAKA
po · 100% · PO 25-075-007
|
Oct 23, 2026 | Oct 16, 2026 |
Nov 02, 2026 → Oct 30, 2026
-3d
TAKA: 2026-10-30 to DALLAS
|
At risk: Need By
-10d slack |
Never |
Needs review
|
| 677 |
26-079 MOCK UP
Old Mill · BLADE WM15
PO 26-079-001
1 note
|
AIR |
26-079 - Old Mill - Mock Up - Blade WM - TAKA
po · 100% · PO 26-079-001
|
Oct 30, 2026 | Oct 23, 2026 |
Nov 09, 2026 → Oct 30, 2026
-10d
TAKA: 2026-10-30 to DALLAS
|
At risk: Need By
-3d slack |
Never |
Needs review
|
| 678 |
26-209 - MOCK-UP and color sample
JH Carter -Benjamin Moore 2062-10 SAMP · 8mm x 50mm flat bar mock up
PO 26-209-001
1 note
|
AIR |
26-209 - JH Carter -Benjamin Moore 2062-10 SAMP - TAKA
po · 100% · PO 26-209-001
|
Oct 20, 2026 | Oct 13, 2026 |
Nov 09, 2026 → Oct 30, 2026
-10d
TAKA: 2026-10-30 to DALLAS
|
At risk: Need By
-13d slack |
Never |
Needs review
|
| 679 |
25-130 - - Mock Up
Warren School · STRUC MOCK UP-MC71
PO 25-130-001
1 note
|
AIR |
25-130 - Warren School - Mock Up - TAKA
po · 100% · PO 25-130-001
|
Nov 06, 2026 | Oct 30, 2026 |
Nov 09, 2026 → Oct 30, 2026
-10d
TAKA: 2026-10-30 to DALLAS
|
On track
4d slack |
Never |
Needs review
|
| 680 |
26-190 MOCK UP
Interstate Sioux Falls · CIRCA CABLE MOCK UP
PO 26-190-001
1 note
|
AIR |
26-190 - Interstate Sioux Falls - Mock Up - TAKA
po · 100% · PO 26-190-001
|
Nov 13, 2026 | Nov 06, 2026 |
Nov 09, 2026 → Oct 30, 2026
-10d
TAKA: 2026-10-30 to DALLAS
|
On track
11d slack |
Never |
Needs review
|
| 681 |
25-033 - - MP4
East Montgomery - Stair 06 Handrails · bending tube
PO 25-033-023
1 note
|
AIR |
25-033 - East Montgomery - Stair 06 Handrails - MP4- TAKA
po · 100% · PO 25-033-023
|
Nov 06, 2026 | Oct 30, 2026 |
Nov 16, 2026 → Oct 30, 2026
-17d
TAKA: 2026-10-30 to DALLAS
|
On track
4d slack |
Never |
Needs review
|
| 682 |
25-062 - - IP3
RDNI · PICKET PANEL
PO 25-062-009
1 note
|
AIR |
25-062 - RDNI - IP3- TAKA
po · 100% · PO 25-062-009
|
Nov 06, 2026 | Oct 30, 2026 |
Nov 16, 2026 → Oct 30, 2026
-17d
TAKA: 2026-10-30 to DALLAS
|
On track
4d slack |
Never |
Needs review
|
| 684 |
25-050 - - IP1 & IP2 Remakes
Cheshire Elementary School · IP2 Remakes
PO TAKA COST
4 notes
|
AIR |
25-050 - Cheshire Elementary School - IP1 & IP2 Remakes - TAKA- PO APPROVAL
fuzzy · 100% · job 25-050 + pack IP1; close runner-up
3 candidates
|
Oct 30, 2026 |
none → Nov 03, 2026
TAKA: 2026-11-03 to DALLAS
|
Not assessed | Never |
Needs review
|
|
| 687 |
24-040 -- 1MP6
Project Meadow - Additional Glass Scope L10 · U CAP CONNECTOR
PO 24-040-047
3 notes
|
AIR |
24-040 - Project Meadow - Additional Glass Scope L10- 1MP6 - TAKA
po · 100% · PO 24-040-047
|
Nov 13, 2026 | Nov 06, 2026 |
Nov 23, 2026 → Nov 03, 2026
-20d
TAKA: 2026-11-03 to DALLAS
|
On track
6d slack |
Never |
Needs review
|
| Batch 76 · TAKA COST · ETA to DALLAS | |||||||||
| 691 |
24-040 -- 2IP4
Project Meadow - Level 8 Picket · ALU PICKET PANEL
PO 24-040-046
1 note
|
AIR |
24-040 - Project Meadow - Level 8 Picket- 2IP4 - TAKA
po · 100% · PO 24-040-046
|
Nov 13, 2026 | Nov 06, 2026 |
Nov 23, 2026 → Nov 08, 2026
-15d
TAKA: 2026-11-08 to DALLAS
|
At risk: Need By
-1d slack |
Never |
Needs review
|
| 692 |
24-040 -- - 2MP6
Project Meadow - Level 8 Picket · FITTINGS
PO 24-040-045
1 note
|
AIR |
24-040 - Project Meadow - Level 8 Picket- 2MP6 - TAKA
po · 100% · PO 24-040-045
|
Nov 13, 2026 | Nov 06, 2026 |
Nov 23, 2026 → Nov 08, 2026
-15d
TAKA: 2026-11-08 to DALLAS
|
At risk: Need By
-1d slack |
Never |
Needs review
|
| 693 |
24-040 - -2MP7
Project Meadow · FITTINGS
PO 24-040-052
1 note
|
AIR |
24-040 - Project Meadow -2MP7 - TAKA
po · 100% · PO 24-040-052
|
Nov 13, 2026 | Nov 10, 2026 |
Nov 23, 2026 → Nov 08, 2026
-15d
TAKA: 2026-11-08 to DALLAS
|
At risk: Need By
-1d slack |
Never |
Needs review
|
| Batch 77 · no shipment # · ETA to DALLAS | |||||||||
| 699 |
25-118 --1MP2 (air parts )
NWISD - PHASE 1 METAL · POST
PO 25-118-013
1 note
|
AIR |
25-118 - NWISD - PHASE 1 - METAL 1MP2 - TAKA
po · 100% · PO 25-118-013
|
Dec 04, 2026 | Nov 20, 2026 |
Nov 23, 2026 → Nov 15, 2026
-8d
TAKA: 2026-11-15 to DALLAS
|
On track
13d slack |
Never |
Needs review
|
| 701 |
25-206 - - 1MP3
Newman Smith HS Renovation - Stair 14 · CONNECTOR
PO 25-206-005
1 note
|
AIR |
25-206 - Newman Smith HS Renovation - Stair 14 - 1MP3 - TAKA
po · 100% · PO 25-206-005
|
Nov 27, 2026 | Nov 20, 2026 |
Nov 23, 2026 → Nov 15, 2026
-8d
TAKA: 2026-11-15 to DALLAS
|
On track
6d slack |
Never |
Needs review
|
| 702 |
25-206 - -1IP2
Newman Smith HS Renovation - Stair 14 · wire mesh panel
PO 25-206-006
1 note
|
AIR |
25-206 - Newman Smith HS Renovation - Stair 14 -1IP2 - TAKA
po · 100% · PO 25-206-006
|
Nov 27, 2026 | Nov 20, 2026 |
Nov 23, 2026 → Nov 15, 2026
-8d
TAKA: 2026-11-15 to DALLAS
|
On track
6d slack |
Never |
Needs review
|
| 707 |
25-120 - - 1IP2
Clemson Veterinary(HUB BUILDING) · WM PANEL--pc35
PO 25-120-009
1 note
|
AIR |
25-120 - Clemson Veterinary - PHASE 2 - 2IP2 - TAKA
po · 100% · PO 25-120-009
|
Dec 04, 2026 | Nov 27, 2026 |
Nov 23, 2026 → Nov 15, 2026
-8d
TAKA: 2026-11-15 to DALLAS
|
On track
13d slack |
Never |
Needs review
|
| 718 |
25-048-G01 REAMKE
Dillard Rd · G01 REAMKE GLASS
PO TAKA COST
3 notes
|
AIR |
25-048 - Dillard Rd - GP1 Remake - TAKA
fuzzy · 79% · description similarity
2 candidates
|
Dec 01, 2026 | Nov 24, 2026 |
Nov 30, 2026 → Nov 22, 2026
-8d
TAKA: 2026-11-22 to DALLAS
|
On track
4d slack |
Never |
Needs review
|
| 719 |
25-206 - - 1MP3
Newman Smith HS Renovation - Stair 14 · FITTINGS
PO 25-206-005
3 notes
|
AIR |
25-206 - Newman Smith HS Renovation - Stair 14 - 1MP3 - TAKA
po · 100% · PO 25-206-005
|
Nov 27, 2026 | Nov 20, 2026 |
Nov 23, 2026 → Nov 22, 2026
-1d
TAKA: 2026-11-22 to DALLAS
|
On track
0d slack |
Never |
Needs review
|
| 720 |
25-206 - -1IP2
Newman Smith HS Renovation - Stair 14 · WM PANEL
PO 25-206-006
3 notes
|
AIR |
25-206 - Newman Smith HS Renovation - Stair 14 -1IP2 - TAKA
po · 100% · PO 25-206-006
|
Nov 27, 2026 | Nov 20, 2026 |
Nov 23, 2026 → Nov 22, 2026
-1d
TAKA: 2026-11-22 to DALLAS
|
On track
0d slack |
Never |
Needs review
|
| 723 |
25-120 - - 2MP1
Clemson Veterinary - PHASE 2 · CUBE POST--pc35
PO 25-120-004
2 notes
|
AIR |
No task
PO 25-120-004 is on 2 tasks
2 candidates
|
none → Nov 27, 2026
TAKA: 2026-11-27 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| 724 |
25-120 - - 2IP1
Clemson Veterinary - PHASE 2 · WM PANEL--pc35
PO 25-120-007
2 notes
|
AIR |
No task
PO 25-120-007 is on 2 tasks
2 candidates
|
none → Nov 27, 2026
TAKA: 2026-11-27 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| 725 |
25-120 - - 2IP2
Clemson Veterinary - PHASE 2 · WM PANEL--pc35
PO 25-120-009
3 notes
|
AIR |
25-120 - Clemson Veterinary - PHASE 2 - 2IP2 - TAKA
po · 100% · PO 25-120-009
|
Dec 04, 2026 | Nov 27, 2026 |
Nov 23, 2026 → Nov 27, 2026
+4d
TAKA: 2026-11-27 to DALLAS
|
On track
4d slack |
Never |
Needs review
|
| 726 |
25-120 - - 2MP2
Clemson Veterinary - PHASE 2 · CUBE POST--pc35
PO 25-120-010
2 notes
|
AIR |
No task
PO 25-120-010 is on 2 tasks
2 candidates
|
none → Nov 27, 2026
TAKA: 2026-11-27 to DALLAS
|
Not assessed | Never |
Needs review
|
||
| 732 |
26-071 - - Mock Up
Purdue ASB - Perf FOLD · MOCK UP
PO HOLDING
7 notes
|
AIR |
26-071 - Purdue ASB - Perf FOLD - Mock Up - TAKA
fuzzy · 100% · description similarity; close runner-up
2 candidates
|
Nov 27, 2026 | Nov 20, 2026 |
none → HOLDING
TAKA: HOLDING to DALLAS
|
Not assessed | Never |
Needs review
|
| Batch 79 · no shipment # · ETA to LA | |||||||||
| 745 |
26-047- GP1
Lab 4.0 Core & Shell - Stair 2 w/ Smoke Baffle · bending glass
PO 26-047-003
|
OCEAN |
No task
PO 26-047-003 is on 2 tasks
2 candidates |
none → Dec 03, 2026
TAKA: 2026-11-19 to LA
|
Not assessed | Never |
Needs review
|
||
| Batch 80 · no shipment # · ETA to LA | |||||||||
| 752 |
26-088 AML (balance BR192SL-V1)
Eastern Hills · FITTINGS
PO 26-088-004
1 note
|
OCEAN |
26-088 - Eastern Hills - AML - TAKA
po · 100% · PO 26-088-004
|
Nov 20, 2026 | Nov 06, 2026 |
Nov 23, 2026 → Dec 10, 2026
+17d
TAKA: 2026-11-26 to LA
|
At risk: LA + Need By
-20d slack |
Never |
Needs review
|
| 753 |
25-192 GP1
WSVN 7 · NON REFLECTIVE/NON GLARE
PO 25-192-008
|
OCEAN |
No task
PO 25-192-008 is on 3 tasks
3 candidates
|
none → Dec 10, 2026
TAKA: 2026-11-26 to LA
|
Not assessed | Never |
Needs review
|
||
| 754 |
25-118 --1MP2
NWISD - PHASE 1 METAL · POST
PO 25-118-013
1 note
|
OCEAN |
25-118 - NWISD - PHASE 1 - METAL 1MP2 - TAKA
po · 100% · PO 25-118-013
|
Dec 04, 2026 | Nov 20, 2026 |
Nov 23, 2026 → Dec 10, 2026
+17d
TAKA: 2026-11-26 to LA
|
At risk: LA + Need By
-6d slack |
Never |
Needs review
|
| 755 |
25-029 - - 3MP1
Richardson · circa multiline post
PO 25-029-009
|
OCEAN |
No task
PO 25-029-009 is on 2 tasks
2 candidates
|
none → Dec 10, 2026
TAKA: 2026-11-26 to LA
|
Not assessed | Never |
Needs review
|
||
| 760 |
25-162 - - MP1
North Central Texas College Residence Hall · BLADE POST
PO 25-162-003
2 notes
|
OCEAN |
No task
PO 25-162-003 is on 2 tasks
2 candidates |
none → Dec 22, 2026
TAKA: 2026-12-08 to LA
|
Not assessed | Never |
Needs review
|
||
| 763 |
26-109 Salvation Army
Salvation Army · Salvation Army
PO 26-109-008
2 notes
|
OCEAN |
No task
PO 26-109-008 is on 2 tasks
2 candidates
|
none → Dec 22, 2026
TAKA: 2026-12-08 to LA
|
Not assessed | Never |
Needs review
|
||
Activity
- Nov 02, 2026 09:03 AM worker analysed {"lines": 678, "source": "live", "tasks": 218}
- Nov 02, 2026 09:03 AM VIVA Procurement uploaded {"filename": "2026 Delivery Schedule Template 2026-10-20.xlsx", "sha256": "0ff223cb244929602c12bbcd0636d72e7b8cfdfbe1989330cb2c60d7e1b3b740"}