TAKA ETA Synchronizer
VIVA Procurement (lead)
← All uploads

2026 Delivery Schedule Template 2026-08-26.xlsx

Run 1 · uploaded Oct 28, 2026 03:16 PM by VIVA Procurement · sheet "Sheet1 (2)", 63 batches

ready
21will update in Wrike 65need review 417unmatched 14at risk 10 LA · 13 Need By 1waiting on TAKA 6no change
Row Schedule line Mode Wrike task Need By LA Need By Prior ETA → New ETA Risk PM last notified Decision
Batch 37 · SZXLAX67036X · ETA to LA
327 26-022 - - IP1
Telluride School District · zinc primer--MATTE BLACK
PO 26-022-001
1 note
  • metal_ready: unrecognised date format ('recoating, and estimated ready6/17/2026')
OCEAN 26-022 - Telluride School District - IP1- TAKA
po · 100% · PO 26-022-001
Jul 07, 2026 Jun 26, 2026 Aug 07, 2026 → Aug 07, 2026
TAKA: 2026-07-24 to LA
At risk: LA + Need By
-31d slack
Never No change
Batch 42 · SZXCHI67004Y · ETA to DALLAS
382 TSC-ST26029 sample air parts
Panelscape sample · Panelscape sample
PO VS2026-025
1 note
  • task has no Need By date
AIR Panelscape samples 2"x2"
po · 100% · PO VS2026-025
Jul 13, 2026 → Jul 13, 2026
TAKA: 2026-07-13 to DALLAS
Not assessed Never No change
Batch 46 · SZXLAX67350X · ETA to LA
421 26-052 MP1
DFW Airport Terminal · U CAP -BENT
PO 26-052-005
OCEAN 26-052 DFW Airport Terminal - MP1 - TAKA
po · 100% · PO 26-052-005
Aug 24, 2026 Aug 10, 2026 Aug 20, 2026 → Aug 20, 2026
TAKA: 2026-08-06 to LA
On track
4d slack
Never No change
Batch 52 · SZXLAX68202X · ETA to LA
473 24-075 --Infill Pack 2
DFW CTAE · PNAEL FRAME PLATE
PO 24-075-023
OCEAN 24-075 - DFW CTAE - AREA C4 - EXTERIOR PICKET- IP1 Pending Panel AML -TAKA
po · 100% · PO 24-075-023
Aug 18, 2026 Aug 03, 2026 Sep 10, 2026 → Sep 10, 2026
TAKA: 2026-08-27 to LA
At risk: LA + Need By
-23d slack
Never No change
Batch 57 · SZXLAX68410X · ETA to LA
510 TSC-ST26023 SAMPLE STOCK (Balance Materails)
SAMPLE STOCK · SAMPLE STOCK
PO VS2026-026
2 notes
  • task has no LA Need By date
  • task has no Need By date
OCEAN SAMPLE STOCK - TAKA
po · 100% · PO VS2026-026
Sep 24, 2026 → Sep 24, 2026
TAKA: 2026-09-10 to LA
Not assessed Never No change
Batch 60 · vessel booked · ETA to LA
547 25-192 - - MP1
WSVN 7 · U CAP --PC22 BLACK
PO NA
OCEAN 25-192 - WSVN 7 - MP1 - TAKA
fuzzy · 100% · job 25-192 + pack MP1
Oct 06, 2026 Sep 22, 2026 Oct 01, 2026 → Oct 01, 2026
TAKA: 2026-09-17 to LA
On track
5d slack
Never No change

Activity

21 lines approved for Wrike (ETA field), with 21 comments · dry run. 482 still need a look and will stay in the exception queue.

Link to a Wrike task