TAKA ETA Synchronizer
VIVA Procurement (lead)
← All uploads

2026 Delivery Schedule Template 2026-08-26.xlsx

Run 4 · uploaded Oct 30, 2026 03:39 PM by VIVA Procurement · sheet "Sheet1 (2)", 11 batches

ready
4will update in Wrike 22need review 60unmatched 9at risk 7 LA · 8 Need By 1waiting on TAKA 2no change

422 rows hidden in Excel were skipped (TAKA hides shipped batches). Unhide them in the workbook and upload again to include them.

Row Schedule line Mode Wrike task Need By LA Need By Prior ETA → New ETA Risk PM last notified Decision
Batch 53 · DHL 7057327642 · ETA to DALLAS
479 25-142 MP1 GAEP121U
QTS DFW2 DC3 · GAEP121U
PO NA
2 notes
  • task has no Need By date
  • new ETA Aug 14, 2026 is already in the past; the shipment has probably arrived or this is an old schedule
AIR 25-142 - QTS DFW2 DC3 - MP1 - TAKA
fuzzy · 100% · job 25-142 + pack MP1
1 candidate
Aug 12, 2026 Aug 21, 2026 → Aug 14, 2026 -7d
TAKA: 2026-08-14 to DALLAS
Not assessed Never Needs review
480 25-192 Anti Reflective Glass
WSVN 7 · GLASS SAMPLE
PO NA
AIR 25-192 - WSVN 7 - MP1 - TAKA
fuzzy · 75% · description similarity
3 candidates
Oct 06, 2026 Sep 22, 2026 Oct 01, 2026 → Aug 14, 2026 -48d
TAKA: 2026-08-14 to DALLAS
On track
50d slack
Never Needs review
481 color sample for 24-075 IP1
DFW CTAE AREA C4 · color sample
PO NA
1 note
  • task has no Need By date
AIR 24-075 - DFW CTAE - AREA C4 (BRIDGES) - IP1 - TAKA- PO APPROVAL
fuzzy · 90% · job 24-075 + pack IP1; close runner-up
3 candidates
Sep 10, 2026 none → Aug 14, 2026
TAKA: 2026-08-14 to DALLAS
Not assessed Never Needs review
Batch 54 · SZXLAX68319X · ETA to LA
483 TSC-ST26023 SAMPLE STOCK (part of materails)
SAMPLE STOCK · SAMPLE STOCK
PO VS2026-026
3 notes
  • task has no LA Need By date
  • task has no Need By date
  • new ETA Sep 16, 2026 is already in the past; the shipment has probably arrived or this is an old schedule
OCEAN SAMPLE STOCK - TAKA
po · 100% · PO VS2026-026
Sep 24, 2026 → Sep 16, 2026 -8d
TAKA: 2026-09-02 to LA
Not assessed Never Needs review
Batch 58 · Flight booked · ETA to DALLAS
518 25-041 - - GP1 Remake G09
Jackson Walker · BEND GLASS
PO NA
1 note
  • new ETA Sep 06, 2026 is already in the past; the shipment has probably arrived or this is an old schedule
AIR 25-041 - Jackson Walker - GP1 Remake- TAKA
fuzzy · 100% · job 25-041 + pack GP1
1 candidate
Jun 24, 2026 Jun 17, 2026 Oct 08, 2026 → Sep 06, 2026 -32d
TAKA: 2026-09-06 to DALLAS
At risk: Need By
-80d slack
Never Needs review
519 24-040 - - 2IP3
Project Meadow - PH2 Level 10 · ALU PICKET PANEL 48.3
PO 24-040-035
AIR 24-040 - Project Meadow - 2P02 - TAKA
fuzzy · 84% · task title has no pack code to confirm 2IP3
3 candidates
Nov 20, 2026 Nov 13, 2026 none → Sep 06, 2026
TAKA: 2026-09-06 to DALLAS
On track
69d slack
Never Needs review
520 24-040 2MP5
Project Meadow - PH2 Level 10 · ALU POST
PO 24-040-034
AIR 24-040 - Project Meadow - 2P02 - TAKA
fuzzy · 84% · task title has no pack code to confirm 2MP5
3 candidates
Nov 20, 2026 Nov 13, 2026 none → Sep 06, 2026
TAKA: 2026-09-06 to DALLAS
On track
69d slack
Never Needs review
521 24-040 MP5
Project Meadow · SS316 CLADDING
PO none
1 note
  • task has no Need By date
AIR 24-040 - Project Meadow - MP5 Cladding - TAKA- PO APPROVAL
fuzzy · 90% · job 24-040 + pack MP5; close runner-up
3 candidates
Sep 04, 2026 none → Sep 06, 2026
TAKA: 2026-09-06 to DALLAS
Not assessed Never Needs review
Batch 59 · no shipment # · ETA to DALLAS
526 26-086 - - MP1
TCAT Memphis · FOLD POST-SS316/304
PO 26-086-003
1 note
  • new ETA Sep 13, 2026 is already in the past; the shipment has probably arrived or this is an old schedule
AIR 26-086 - TCAT Memphis - MP1 -TAKA
fuzzy · 100% · job 26-086 + pack MP1
1 candidate
Sep 25, 2026 Sep 18, 2026 Sep 14, 2026 → Sep 13, 2026 -1d
TAKA: 2026-09-13 to DALLAS
On track
6d slack
Never Needs review
535 25-149 MP1
New Albany · ALU FRAME PANEL---PC41
PO NA
4 notes
  • task has no Need By date
  • new ETA Sep 20, 2026 is already in the past; the shipment has probably arrived or this is an old schedule
  • container_dispatch 2026-09-19 differs from batch majority 2026-09-12
  • eta 2026-09-20 differs from batch majority 2026-09-13
AIR 25-149 - New Albany - MP1 - TAKA- PO APPROVAL
fuzzy · 90% · job 25-149 + pack MP1
1 candidate
none → Sep 20, 2026
TAKA: 2026-09-20 to DALLAS
Not assessed Never Needs review
Batch 60 · vessel booked · ETA to LA
544 24-075 - IP1
DFW CTAE AREA C4 · 12mm LASER CUT PANEL - PP11--color as sample
PO 24-075-027
5 notes
  • task has no Need By date
  • new ETA Oct 01, 2026 is already in the past; the shipment has probably arrived or this is an old schedule
  • metal_ready: unrecognised date format ('COLOR HAVE NOT CONFIRMED')
  • vessel_loading: unrecognised date format ('COLOR HAVE NOT CONFIRMED')
  • container_dispatch: unrecognised date format ('COLOR HAVE NOT CONFIRMED')
OCEAN 24-075 - DFW CTAE - AREA C4 (BRIDGES) - IP1 - TAKA- PO APPROVAL
po · 100% · PO 24-075-027
Sep 10, 2026 none → Oct 01, 2026
TAKA: 2026-09-17 to LA
At risk: LA Never Needs review
Batch 61 · no shipment # · ETA to LA
552 24-040 -MP1
Project Meadow - PH4 Penthouse · ALU PANEL---PC40
PO 24-040-032
OCEAN 24-040 - Project Meadow - 2P02 - TAKA
fuzzy · 84% · task title has no pack code to confirm MP1
3 candidates
Nov 20, 2026 Nov 13, 2026 none → Oct 08, 2026
TAKA: 2026-09-24 to LA
On track
43d slack
Never Needs review
554 26-061 Metal Pack 1
Warriors FH · VORTEX POST
PO 26-061-002
OCEAN No task
PO 26-061-002 is on 2 tasks
2 candidates
none → Oct 08, 2026
TAKA: 2026-09-24 to LA
Not assessed Never Needs review
555 25-125 -- GP1
CACC Aviation Hangar · GLASS
PO 25-125-005
1 note
  • new ETA Oct 08, 2026 is already in the past; the shipment has probably arrived or this is an old schedule
OCEAN 25-125 - CACC Aviation Hangar - GP1 -TAKA
po · 100% · PO 25-125-005
Oct 06, 2026 Sep 22, 2026 Oct 22, 2026 → Oct 08, 2026 -14d
TAKA: 2026-09-24 to LA
At risk: LA + Need By
-2d slack
Never Needs review
Batch 62 · no shipment # · ETA to LA
557 26-046 - MP1
Cobb Galleria · FRAME POST-PPG color
PO NA
2 notes
  • new ETA Oct 26, 2026 is already in the past; the shipment has probably arrived or this is an old schedule
  • container_dispatch 2026-09-28 differs from batch majority 2026-09-30
OCEAN 26-046 Cobb Galleria - MP1 - TAKA
fuzzy · 100% · job 26-046 + pack MP1
2 candidates
Oct 14, 2026 Oct 15, 2026 Oct 28, 2026 → Oct 26, 2026 -2d
TAKA: 2026-10-12 to LA
At risk: Need By
-12d slack
Never Needs review
558 26-046 - IP1
Cobb Galleria · ALU PANEL-PPG color
PO NA
1 note
  • new ETA Oct 26, 2026 is already in the past; the shipment has probably arrived or this is an old schedule
OCEAN 26-046 Cobb Galleria - IP1 - TAKA
fuzzy · 100% · job 26-046 + pack IP1
2 candidates
Oct 15, 2026 Oct 01, 2026 Oct 28, 2026 → Oct 26, 2026 -2d
TAKA: 2026-10-12 to LA
At risk: LA + Need By
-11d slack
Never Needs review
559 24-212 1MP1
CISD - Crowley High School - Texas - Phase 2, Arena B&C · CIRCA -FSR POST
PO NA
2 notes
  • new ETA Oct 26, 2026 is already in the past; the shipment has probably arrived or this is an old schedule
  • container_dispatch 2026-09-28 differs from batch majority 2026-09-30
OCEAN 24-212 - CISD - Crowley High School - Texas - Phase 2, Arena B&C - 1MP1 - TAKA
fuzzy · 100% · job 24-212 + pack 1MP1
2 candidates
Oct 15, 2026 Oct 01, 2026 Oct 28, 2026 → Oct 26, 2026 -2d
TAKA: 2026-10-12 to LA
At risk: LA + Need By
-11d slack
Never Needs review
561 25-038 - GP1 REMAKE
East Dallas Government Center · GLASS
PO 25-038-011
OCEAN 25-038 - East Dallas - G08 - TAKA
fuzzy · 84% · task title has no pack code to confirm GP1
3 candidates
Nov 10, 2026 Nov 03, 2026 Nov 16, 2026 → Oct 26, 2026 -21d
TAKA: 2026-10-12 to LA
On track
15d slack
Never Needs review
564 25-096 - 3MP1
Cicero North HS Pool · SS316 VIEW BUTTON
PO NA
1 note
  • new ETA Oct 26, 2026 is already in the past; the shipment has probably arrived or this is an old schedule
OCEAN 25-096 - Cicero North HS Pool - 3MP1 - TAKA
fuzzy · 100% · job 25-096 + pack 3MP1
2 candidates
Oct 20, 2026 Sep 30, 2026 Oct 22, 2026 → Oct 26, 2026 +4d
TAKA: 2026-10-12 to LA
At risk: LA + Need By
-6d slack
Never Needs review
565 25-096 3GP1
Cicero North HS Pool · 21.52pvb glass
PO NA
1 note
  • new ETA Oct 26, 2026 is already in the past; the shipment has probably arrived or this is an old schedule
OCEAN 25-096 - Cicero North HS Pool - 3GP1 - TAKA
fuzzy · 100% · job 25-096 + pack 3GP1
2 candidates
Oct 22, 2026 Oct 08, 2026 Oct 22, 2026 → Oct 26, 2026 +4d
TAKA: 2026-10-12 to LA
At risk: LA + Need By
-4d slack
Never Needs review
566 26-062 - - MP2
TAMU COD · CUBE POST
PO NA
1 note
  • new ETA Oct 26, 2026 is already in the past; the shipment has probably arrived or this is an old schedule
OCEAN 26-062 - TAMU COD- MP2- TAKA
fuzzy · 100% · job 26-062 + pack MP2
1 candidate
Oct 21, 2026 Oct 07, 2026 Oct 22, 2026 → Oct 26, 2026 +4d
TAKA: 2026-10-12 to LA
At risk: LA + Need By
-5d slack
Never Needs review
567 25-085 - - MP3
ARC - METAL SPACES · FOLD frame--PC34
PO NA
1 note
  • new ETA Oct 26, 2026 is already in the past; the shipment has probably arrived or this is an old schedule
OCEAN 25-085 - ARC - METAL SPACES - MP3 - TAKA
fuzzy · 100% · job 25-085 + pack MP3
2 candidates
Oct 27, 2026 Oct 13, 2026 Oct 28, 2026 → Oct 26, 2026 -2d
TAKA: 2026-10-12 to LA
On track
1d slack
Never Needs review

Activity

4 lines approved for Wrike (ETA field), with 4 comments · dry run. 82 still need a look and will stay in the exception queue.

Link to a Wrike task